1.) Replace the vanity.
2.) Install a double sink.
3.) Replace the outdated lighting fixures with recessed lighting.
4.) Install the new flooring.
5.) Replace the outdated mirror with two seperate framed mirrors.
6.) Paint the room from top to bottom.
7.) Decorate (new shower curtain, new valance for the window, etc.).
We've got our work cut out for us! (P.S. - Don't mind the mess. At the time I took these pictures, the bathroom had been under construction for a good week so there's crap everywhere.)
0 comments:
Post a Comment