Still left to do:
1.) Hang new mirrors (we bought them last night).
2.) Hang new lighting fixture (still need to purchase).
2.) Hang new lighting fixture (still need to purchase).
3.) Hang new curtains (still need to purchase).
4.) Paint the ceiling/touch up some paint sections.
5.) Attach shower curtain rod and hang curtain.
6.) Install new lightswitch and electrical outlet covers.
7.) Decorate!
1 comments:
Great looking bathroom! Love the vanity. Is that 2 linen closets on either side of the tub/shower? If so, lucky duck! Keep up the great job.
Post a Comment